View Mobile Site
  •  
  • Home
  • OBITS
  •  
  • Marketplace
  •  
  • Community
  •  
  • Gas Prices
  •  

 

Ask the Expert

Signal Photos

 

Closures for I-5/SR-14 Direct HOV Connector Project

Posted: February 28, 2013 4:34 p.m.
Updated: February 28, 2013 4:34 p.m.
 

Santa Clarita — The California Department of Transportation (Caltrans) will close the lanes and connector listed below as part of a $161 million improvement project to construct High Occupancy Vehicle (HOV or carpool) lanes and a direct HOV lane connector at the I-5/SR-14 interchange. Closures are subject to change. Detours will be signed.

For the safety of the construction crew and motorists, please be attentive to closures, slow for the cone zone, and move over one lane where possible.

Lane closure information for this and other freeway projects is available on the Caltrans website: http://www.lcswebreports.dot.ca.gov/lcswebreports/

Golden State Freeway (I-5)

Sunday, March 3, through Friday, March 8

§ One lane of northbound I-5 from Balboa Boulevard to Weldon Canyon

TIME: 10 p.m. to 6 a.m.

§ Southbound I-5 off-ramp to Balboa Boulevard

TIME: 10 p.m. to 6 a.m. and 9 a.m. to 3 p.m.

§ One lane of southbound I-5 from Weldon Canyon to Balboa Boulevard

TIME: 11 p.m. to 5 a.m.

Antelope Valley Freeway (SR-14)

Monday, March 4, through Friday, March 8

§ Southbound SR-14 from Sierra Highway to I-5
TIME: 11 p.m. to 4 a.m.

§ Southbound SR-14 off-ramp to San Fernando Road
TIME: 10 p.m. to 6 a.m. and 10 a.m. to 3 p.m.

§ Southbound SR-14 connector to southbound I-5
TIME: 11 p.m. to 4 a.m.

About the Project

This project involves the construction of an elevated two-lane direct HOV connector at the I-5/SR-14 interchange and construction of HOV lanes in both directions at the interchange.
The direct HOV connector enables freeway-to-freeway transfers without exiting the carpool lane.

The project will relieve congestion, improve traffic flow, enhance safety and improve traffic operations on both freeways at the interchange. The work is part of Caltrans’ effort to provide motorists with a seamless carpool lane network in California.

Work began in July 2008 and is on track to be completed in spring 2013. The direct HOV connector opened to traffic in December 2012. Caltrans thanks the motoring public for their patience and understanding during construction.

To find out more about I-5 improvements currently underway, visit

Santa Clarita — The California Department of Transportation (Caltrans) will close the lanes and connector listed below as part of a $161 million improvement project to construct High Occupancy Vehicle (HOV or carpool) lanes and a direct HOV lane connector at the I-5/SR-14 interchange. Closures are subject to change. Detours will be signed.

For the safety of the construction crew and motorists, please be attentive to closures, slow for the cone zone, and move over one lane where possible.

Lane closure information for this and other freeway projects is available on the Caltrans website: http://www.lcswebreports.dot.ca.gov/lcswebreports/

Golden State Freeway (I-5)

Sunday, March 3, through Friday, March 8

§ One lane of northbound I-5 from Balboa Boulevard to Weldon Canyon

TIME: 10 p.m. to 6 a.m.


§ Southbound I-5 off-ramp to Balboa Boulevard

TIME: 10 p.m. to 6 a.m. and 9 a.m. to 3 p.m.


§ One lane of southbound I-5 from Weldon Canyon to Balboa Boulevard

TIME: 11 p.m. to 5 a.m.

Antelope Valley Freeway (SR-14)

Monday, March 4, through Friday, March 8

§ Southbound SR-14 from Sierra Highway to I-5
TIME: 11 p.m. to 4 a.m.

§ Southbound SR-14 off-ramp to San Fernando Road
TIME: 10 p.m. to 6 a.m. and 10 a.m. to 3 p.m.

§ Southbound SR-14 connector to southbound I-5
TIME: 11 p.m. to 4 a.m.

About the Project

This project involves the construction of an elevated two-lane direct HOV connector at the I-5/SR-14 interchange and construction of HOV lanes in both directions at the interchange.
The direct HOV connector enables freeway-to-freeway transfers without exiting the carpool lane.

The project will relieve congestion, improve traffic flow, enhance safety and improve traffic operations on both freeways at the interchange. The work is part of Caltrans’ effort to provide motorists with a seamless carpool lane network in California.

Work began in July 2008 and is on track to be completed in spring 2013. The direct HOV connector opened to traffic in December 2012. Caltrans thanks the motoring public for their patience and understanding during construction.

To find out more about I-5 improvements currently underway, visit www.I-5info.com.

Note: The Signal delivers press releases from reliable sources to provide up-to-the-minute information to our website readers. Information directly from news sources has not been vetted by The Signal news room. It may appear subsequently in news stories after it has been vetted.

 

.

 

Comments

Commenting not available.
Commenting is not available.

 
 

Powered By
Morris Technology
Please wait ...