View Mobile Site
  •  
  • Home
  • OBITS
  •  
  • Marketplace
  •  
  • Community
  •  
  • Gas Prices
  •  

 

Ask the Expert

Signal Photos

 

Construction crew tears down paseo bridge

Posted: January 9, 2012 8:38 p.m.
Updated: January 9, 2012 8:38 p.m.
Manuel Baghramian, construction manager with Encorre, describes the condition of current paseo bridge. Manuel Baghramian, construction manager with Encorre, describes the condition of current paseo bridge.
Manuel Baghramian, construction manager with Encorre, describes the condition of current paseo bridge.
Vahan Hovnanian, president of Encorre, left, and Manuel Baghramian check the bridge. Vahan Hovnanian, president of Encorre, left, and Manuel Baghramian check the bridge.
Vahan Hovnanian, president of Encorre, left, and Manuel Baghramian check the bridge.
Daniel Verdugo, left, and Hector Chavez of Encorre Services Inc. cut through concrete to gain access to bolts on the paseo bridge over Alta Madera Drive near Paseo Lauro Court in Valencia on Monday. The bridge is being dismantled. Daniel Verdugo, left, and Hector Chavez of Encorre Services Inc. cut through concrete to gain access to bolts on the paseo bridge over Alta Madera Drive near Paseo Lauro Court in Valencia on Monday. The bridge is being dismantled.
Daniel Verdugo, left, and Hector Chavez of Encorre Services Inc. cut through concrete to gain access to bolts on the paseo bridge over Alta Madera Drive near Paseo Lauro Court in Valencia on Monday. The bridge is being dismantled.
Gabino Martinez, right, and Juan Venegas of Encorre work to undo bolts. Gabino Martinez, right, and Juan Venegas of Encorre work to undo bolts.
Gabino Martinez, right, and Juan Venegas of Encorre work to undo bolts.
A A A

A construction crew tears down the paseo bridge over Alta Madera Drive near Paseo Lauro Court in Valencia on Monday.

Comments

Commenting not available.
Commenting is not available.

 
 

Powered By
Morris Technology
Please wait ...