|
|
||
|
|
||
The road will be closed nightly between Magic Mountain Parkway and Bouquet Canyon Road on both the eastbound and westbound lanes.
The road will be closed from 7:30 p.m. to 5 a.m. Monday through Friday.
CLWA is installing a pipeline that will transport contaminated groundwater from beneath the Whittaker-Bermite site, a 1,000-acre stretch of contaminated land once home to a munitions manufacturing facility.
The chemical perchlorate, a byproduct of rocket fuel, was found in the groundwater, and the pipeline will transport the water to a facility that will clean the water.

